Start here
Bottleneck thesisStuck at The execution subsystem that physically picks, pushes, or places parcels into the selected output lane or bin., because the graph treats it as a candidate constraint; impact: the selected route.
Open Detail from here to inspect evidence and connected suppliers where modeled.
Secondary signals
Heat 48/100Evidence status: 0 reviewed / 2 total evidence recordsMaturity 52/100p50 RMB 214,079
Key chokepoints
Sorted by risk signal so likely bottlenecks are easier to inspect first.
Selected
Parcel pick-and-place execution subsystem
Bottleneck thesisStuck at The execution subsystem that physically picks, pushes, or places parcels into the selected output lane or bin., because the graph treats it as a candidate constraint; impact: the selected route.
Where it is stuckMaturity 52/100p50 RMB 214,079
Key evidence summary0 reviewed / 2 total evidence records
Inspect next
Heat 48/100No direct bottleneck markerEvidence status: 0 reviewed / 2 total evidence records
Maturity 52/100p50 RMB 214,079
Research controls